Substation Clearances: 69KV

Minimum electrical clearances for outdoor air-insulated substations per NESC Rule 235 and IEEE Std 1427. Includes phase-to-ground, phase-to-phase, fence, roadway and walkway clearances by voltage class.

Electrical Engineeringvoltage class: 69KV1 row
voltage classbil basis kV (kV)clearance over roadway ft (ft)clearance over walkway ft (ft)clearance to fence ft (ft)min phase ground clearance in (in)min phase phase clearance in (in)nesc rulestandard
69KV3502014101821NESC 235IEEE Std 1312 / NESC 2023