Sample data from Engineering Database — 375 reference tables, deterministic calculators, and Engineering AI. Sign up free
Substation Clearances: 38KV
Minimum electrical clearances for outdoor air-insulated substations per NESC Rule 235 and IEEE Std 1427. Includes phase-to-ground, phase-to-phase, fence, roadway and walkway clearances by voltage class.
| voltage class | bil basis kV (kV) | clearance over roadway ft (ft) | clearance over walkway ft (ft) | clearance to fence ft (ft) | min phase ground clearance in (in) | min phase phase clearance in (in) | nesc rule | standard |
|---|---|---|---|---|---|---|---|---|
| 38KV | 200 | 18 | 12.5 | 8 | 13 | 13 | NESC 235 | IEEE Std 1312 / NESC 2023 |
What else is in Engineering Database
Iron Engine ↗Engineering AI at ironengine.ai
AI built for engineering. Searches the engineering database, performs calculations, gives source-backed engineering insights.
Get started for free ↗Reference Data375 engineering tablesMaterial properties, pipe and shape dimensions, code tables, and electrical ratings across mechanical, civil, chemical, electrical, materials, and manufacturing engineering.
Browse dataCalculatorsDeterministic engineering calculatorsSizing, checking, and conversion tools that run against the reference tables. Inputs are code-compliant, outputs are traceable to the source standard.
Browse calculators