Sample data from Engineering Database — 375 reference tables, deterministic calculators, and Engineering AI. Sign up free

Substation Clearances: 500KV

Minimum electrical clearances for outdoor air-insulated substations per NESC Rule 235 and IEEE Std 1427. Includes phase-to-ground, phase-to-phase, fence, roadway and walkway clearances by voltage class.

Electrical Engineeringvoltage class: 500KV1 row
voltage classbil basis kV (kV)clearance over roadway ft (ft)clearance over walkway ft (ft)clearance to fence ft (ft)min phase ground clearance in (in)min phase phase clearance in (in)nesc rulestandard
500KV1,80032261397116NESC 235IEEE Std 1312 / NESC 2023

What else is in Engineering Database

Related data