Substation Clearances: 765KV

Minimum electrical clearances for outdoor air-insulated substations per NESC Rule 235 and IEEE Std 1427. Includes phase-to-ground, phase-to-phase, fence, roadway and walkway clearances by voltage class.

Electrical Engineeringvoltage_class: 765KV1 row
voltage classbil basis kV (kV)clearance over roadway ft (ft)clearance over walkway ft (ft)clearance to fence ft (ft)min phase ground clearance in (in)min phase phase clearance in (in)nesc rulestandard
765KV2,05037.531.515124148NESC_235IEEE Std 1312 / NESC 2023

This is a sample. Search the full substation clearances dataset and 300+ more by creating a free account and accessing the database.

Get started for FREE

Related data