Smoke Control Design
Smoke control design parameters per NFPA 92-2021 and IBC 2021 Section 909 — stairwell and elevator pressurization differentials (0.05–0.10 in. w.g.), door opening force limits (30 lbf max), atrium exhaust prescriptive rates (4–6 ACH), axisymmetric and balcony/window plume mass flow equations (NFPA 92 Eq. 4.1, 4.10, 4.12), design fire heat release rates by occupancy (1000–5000 kW), building leakage areas by tightness class (tight/average/loose), door leakage areas, t² fire growth coefficients, tenability criteria (visibility 16–33 ft, temperature 120°C max, CO FED thresholds), and the smoke filling rate formula. Sources: NFPA 92-2021, IBC 2021 Sec. 909, ASHRAE Handbook HVAC Applications Ch. 54, Klote/Milke Handbook of Smoke Control Engineering.
Attributes
Browse data
Search the full smoke control design dataset with natural language or structured queries.
Search this table