Stormwater Bmp Sizing: permeable_pavement

Stormwater Best Management Practice (BMP) and green infrastructure sizing criteria, pollutant removal efficiencies, and design parameters for 12 BMP types per EPA, International Stormwater BMP Database 2020, MDE, Virginia DEQ, and Minnesota Stormwater Manual

Civil Engineeringbmp_type: permeable_pavement3 rows
bmp typebmp variantTSS removal pct (%)applicable HSGdesign storm in (in)expected lifespan years (years)infiltration rate in per hr min (in/hr)maintenance frequencymax contributing drainage acres (acres)media depth in (in)nitrogen removal pct (%)notespeak flow reduction pct (%)phosphorus removal pct (%)ponding depth in (in)relative cost indexsizing ratio bmp to drainage area (dimensionless)underdrain requiredvolume reduction pct (%)
permeable_pavementfull_infiltration74A,B1200.5annually512301:1 ratio (entire surface area is the BMP). Requires reservoir layer 12 in minimum. HSG A/B recommended for full infiltration. Annual vacuum sweeping required. No underdrain.80410medium1no75
permeable_pavementpermeable_interlocking_concrete74A,B,C,D1300annually51230PICP with underdrain or full infiltration depending on soils. 30-yr lifespan. Requires proper base/subbase compaction. Joint sand replacement needed.50410medium1optional30
permeable_pavementporous_asphalt74A,B1150.5annually51830Porous asphalt surface with 18 in stone reservoir. Shorter lifespan than concrete (15 vs 20 yr). Annual vacuum sweeping critical to maintain permeability.80410medium1no75