Stormwater Bmp Sizing: dry_detention

Stormwater Best Management Practice (BMP) and green infrastructure sizing criteria, pollutant removal efficiencies, and design parameters for 12 BMP types per EPA, International Stormwater BMP Database 2020, MDE, Virginia DEQ, and Minnesota Stormwater Manual

Civil Engineeringbmp_type: dry_detention3 rows
bmp typebmp variantTSS removal pct (%)applicable HSGdesign storm in (in)expected lifespan years (years)maintenance frequencymax contributing drainage acres (acres)media depth in (in)nitrogen removal pct (%)notespeak flow reduction pct (%)phosphorus removal pct (%)ponding depth in (in)relative cost indexsizing ratio bmp to drainage area (dimensionless)underdrain requiredvolume reduction pct (%)
dry_detentionenhanced_extended_detention65A,B,C,D130annually5002040-hr EDT design. TSS 65% per Maryland ESD manual level-2. Enhanced settling with micropool.753018low0.02no20
dry_detentionextended_detention50A,B,C,D130annually50015Sized for 24-hr extended detention of WQv (1 in design storm). TSS 50% for 24-hr EDT per NJ BMP Manual 2004. Minimal P removal. Primarily peak flow control.702012low0.02no15
dry_detentionmicropool_extended_detention70A,B,C,D0.7530annually50025Micropool EDT pond. Permanent pool 1-10% of total pool volume prevents re-suspension. Improved TSS performance 70% vs standard EDT 50%.753518low0.02no20