Sample data from Engineering Database — 375 reference tables, deterministic calculators, and Engineering AI. Sign up free

Roadway Geometric Design: stopping sight distance

ssd 65 to ssd 80

AASHTO Green Book 7th Edition (2018) roadway geometric design standards — stopping sight distance (15–80 mph), passing sight distance (20–70 mph), minimum horizontal curve radius by design speed and emax (4%/6%/8%), K-values for crest and sag vertical curves (25–80 mph), maximum grade limits by terrain type (level/rolling/mountainous) and road class (freeway/arterial/collector/local), superelevation standards, lane and shoulder width standards, and design vehicle dimensions (P, SU, WB-40, WB-62, WB-67).

Civil Engineeringparameter type: stopping sight distance4 rowsPage 2 of 2
parameter typerecord iddescriptiondesign speed mph (mph)standardunitvalue min (varies)value typical (varies)
stopping sight distancessd 65Stopping sight distance — 65 mph design speed65AASHTO Green Book 7th Ed 2018 Table 3-1ft645645
stopping sight distancessd 70Stopping sight distance — 70 mph design speed70AASHTO Green Book 7th Ed 2018 Table 3-1ft730730
stopping sight distancessd 75Stopping sight distance — 75 mph design speed75AASHTO Green Book 7th Ed 2018 Table 3-1ft820820
stopping sight distancessd 80Stopping sight distance — 80 mph design speed80AASHTO Green Book 7th Ed 2018 Table 3-1ft910910

What else is in Engineering Database

Related data