Roadway Geometric Design: stopping_sight_distance

AASHTO Green Book 7th Edition (2018) roadway geometric design standards — stopping sight distance (15–80 mph), passing sight distance (20–70 mph), minimum horizontal curve radius by design speed and emax (4%/6%/8%), K-values for crest and sag vertical curves (25–80 mph), maximum grade limits by terrain type (level/rolling/mountainous) and road class (freeway/arterial/collector/local), superelevation standards, lane and shoulder width standards, and design vehicle dimensions (P, SU, WB-40, WB-62, WB-67).

Civil Engineeringparameter_type: stopping_sight_distance3 rows
parameter typerecord iddescriptiondesign speed mph (mph)notesunitvalue min (varies)value typical (varies)
stopping_sight_distancessd_15Stopping sight distance — 15 mph design speed15SSD = 0.278*V*t + V^2/(254*a); t=2.5s PRTD, a=3.4 m/s2; eye ht 3.5ft, object ht 2.0ftft8080
stopping_sight_distancessd_20Stopping sight distance — 20 mph design speed20Per AASHTO 2018 Table 3-1; perception-reaction time 2.5 s, a=11.2 ft/s2ft115115
stopping_sight_distancessd_25Stopping sight distance — 25 mph design speed25Per AASHTO 2018 Table 3-1ft155155

This is a sample. Search the full roadway geometric design dataset and 300+ more by creating a free account and accessing the database.

Get started for FREE

Related data