Roadway Geometric Design: sag_vertical_curve

AASHTO Green Book 7th Edition (2018) roadway geometric design standards — stopping sight distance (15–80 mph), passing sight distance (20–70 mph), minimum horizontal curve radius by design speed and emax (4%/6%/8%), K-values for crest and sag vertical curves (25–80 mph), maximum grade limits by terrain type (level/rolling/mountainous) and road class (freeway/arterial/collector/local), superelevation standards, lane and shoulder width standards, and design vehicle dimensions (P, SU, WB-40, WB-62, WB-67).

Civil Engineeringparameter_type: sag_vertical_curve3 rows
parameter typerecord iddescriptiondesign speed mph (mph)notesunitvalue min (varies)value typical (varies)
sag_vertical_curvek_sag_25Sag vertical curve K-value — 25 mph25K based on headlight sight distance; comfort criterion governs at sag curves; h1=2.0ft headlight ht, 1-degree upward beam divergenceft/%2626
sag_vertical_curvek_sag_30Sag vertical curve K-value — 30 mph30K=37; per AASHTO 2018 Table 3-36ft/%3737
sag_vertical_curvek_sag_35Sag vertical curve K-value — 35 mph35K=49ft/%4949

This is a sample. Search the full roadway geometric design dataset and 300+ more by creating a free account and accessing the database.

Get started for FREE

Related data