Nuclear Decay Heat Curves: U238_fast

Decay heat power fraction vs time after shutdown for nuclear reactor design and spent fuel management. Covers U-235 thermal fission, U-238 fast fission, Pu-239 thermal fission, standard PWR (45 GWd/tHM), standard BWR (45 GWd/tHM), and MOX fuel per ANSI/ANS-5.1-2014. Time range: 1 second to 10 years. Includes dominant isotope contributors and 2-sigma uncertainty.

Nuclear Engineeringfuel_type: U238_fast3 rows
fuel typetime after shutdown sdecay heat fraction of operating power (dimensionless)notesstandarduncertainty pct 2sigma (%)
U238_fast10.07Fast fission of U-238; slightly higher initial fraction than U-235 due to different fission product yield distribution; per ANS 5.1-2014 Table for U-238 fast fissionANS_5.1_20146
U238_fast100.057110 s after shutdown; U-238 fast fission product decay; slightly higher early decay than U-235ANS_5.1_20146
U238_fast1000.0413100 s; Way-Wigner correction for U-238 fast fission; comparable to U-235 values but with different isotope distributionANS_5.1_20145

This is a sample. Search the full nuclear decay heat curves dataset and 300+ more by creating a free account and accessing the database.

Get started for FREE

Related data